Construction Project of Support Foundation for Gongga Shanhailuogou Cableway 4 #
1 / 2

Construction Project of Support Foundation for Gongga Shanhailuogou Cableway 4 #

  • Project Location
    sichuan
  • Horizontal Length
    m
  • Vertical distance
    m
  • One-way Volume
  • Line Speed
  • Project Introduction

    In 2021, the construction of the foundation for the 4 # bracket of the Hailuogou Cableway was completed in 42 days, including but not limited to bracket support, original foundation removal, steel bar production and installation, formwork installation, foundation concrete pouring and formwork removal, and bracket support structure removal. Hailuogou 4 # Cableway Support Maintenance Construction: Power line maintenance and welding construction of a total of 11 welds on 2 #, 3 #, and 4 # supports.