The project is invested by Shandong Tianmeng Tourism Development Co., Ltd., designed by the Swiss Gravenda Domaya Group, and implemented by the Ruiteng Cableway. It lasted for 528 days, with a one-way passenger volume of 1668 people per hour, and each carriage can accommodate 160 people. The drive is located at the station, with a height difference of 490 meters. There are more than 150 line foundations in total, and the inclined length of the line is 1835 meters, which is the longest in Asia.