RUITENG RUITENG

Cableway Installation Project
ruiteng ropeway
您当前位置:CASE >> Cableway Installation Project >>
Ruyifeng Cableway Installation Project
1 / 5

Ruyifeng Cableway Installation Project

  • Project Location
    guangxi
  • Horizontal Length
    1800 m
  • Vertical distance
    242 m
  • One-way Volume
    2000 人/h
  • Line Speed
    0.25-6/s Adjustable
  • Project Introduction

    Imported equipment from French POMA company has been introduced, and the overall operation and safety system adopts advanced passenger cableway technology and full process digital automation control system, with technical indicators reaching world level.