RUITENG RUITENG

Cableway Installation Project
ruiteng ropeway
您当前位置:CASE >> Cableway Installation Project >>
Meiling Cloud Scenic Area Cableway EPC Project
1 / 6

Meiling Cloud Scenic Area Cableway EPC Project

  • Project Location
    jiangxinanchang
  • Horizontal Length
    5580 m
  • Vertical distance
    710 m
  • One-way Volume
    1500
  • Line Speed
    0.25-6/s Adjustable
  • Project Introduction

    The scope of the EPC project for the cableway of the Meiling Cloud Scenic Area in Nanchang includes the installation of cableway equipment, construction of support foundations and equipment foundations, construction of lightning protection and grounding devices for the line, construction of protective sheds for passing roads, secondary transportation of cableway equipment, rescue access roads, rescue cable bridges, repair of defects and warranty work during the warranty period of the project.